PAUSED
LOCK IN — LI7 v1.9.1
ESC or ⏸ to resume · R to rotate pieces
SELECT YOUR MODE TO BEGIN
🎓
TRAINING
Watch an ideal wall load in a continuous loop. Study the foundation-first NC anchoring strategy before your shift.
🚛
SHIFT
Free-build walls back to back. At 85%+ height, advance to the next wall. Load as many as you can — just like a real shift.
🏆
LEVELS
Graduating scenarios with time pressure, load requirements, and specific freight challenges.
COMING SOON
TRAINING WATCH THE WALL · READ THE PRINCIPLE
PRESS PLAY TO BEGIN
LOCK IN — FREIGHT LOADING SIMULATOR
Each placement demonstrates a real hub loading principle used on every shift. Watch where pieces go and why — then go load one yourself.
PACE:
ESC OR ✕ EXIT TO RETURN TO MENU
◈ OPS TERMINAL
CUBES
0
PPH
WALL HT
0%
STRUCT
100%
BALANCE
STABLE
PACK
0%
PLACED
0
SHELVES
0
LOCKS
0
ELAPSED
00:00
TRAILER
#1
▶ PRESELECTOR BELT — SELECT A PIECE
DISPATCH IN —s
✓ 92% — WALL COMPLETE
OR KEEP LOADING → MAX PACK
💡 BUILD FLOOR SHELF WITH NC'S FIRST — SETS THE FOUNDATION
◈ LOAD ASSESSMENT
A WALL QUALITY
STRUCT
100
BALANCE
100
DENSITY
0
SUPPORT
100
WEIGHT MIX
0% HVY
0% REG
0% SML
VOIDS
0
SHELVES LOCKED
0
BULKHEADS
0
NC ON WALL
0
CRUNCHES
0
▸ COACH
Load your floor first.
Place NCs along the floor before stacking regular freight — it anchors your wall.
ROUND
OVER
0Total Cubes
0Best PPH
0Trailers
100%Avg Integrity
WWW.ZENGINE.SITE | © 2026 ZENGINE™